Our recognition and achievements
Phase 2 of the Bow Valley College Redevelopment & Expansion project involved the development of seven floors of educational space, a single floor of service space (mechanical, etc.), and a three level underground parkade.
Adjustable lighting for illumination of task areas only, combined with flexible lighting. Shade controls allows each operator to configure the interior environment as desired.
Lighting retrofit incorporated 273,000 ft2 of terminal space. Lamp conversions, variable output photocell, BMS low voltage and occupancy controls significantly reduce energy by 800 kW (40%), with a pay-back of 1.2 years.